Recent Major Completed and Ongoing Projects :

 

S. No

DESCRIPTION OF WORK

VALUE OF WORK ORDER

STATUS

NAME OF THE CLIENT

01

IMPROVEMENT FROM COLLEGE JUNCTION TO MISHRAPADA JUNCTION OF ANGUL TOWN ROAD

7,501,036.00

Completed

Executive Engineer,
Angul(R&B) Division

02

S/R TO BALIMI--BABANDHA-PDA ADA ROAD

20,491,177.00

Completed

Executive Engineer
Dhenkanal (R&B) Division

03

IMPROVEMENT TO OLD N.H -42 ROAD FROM 79/745 KM TO 82/750 KM AND 84/0 KM TO 84/400 KM NEAR MERAMUNDALI IN THE DISTRICT OF DHENKANAL UNDER STATE PLAN FOR THE YEAR 2016-2017

21,404,564.00

Completed

Executive Engineer
Dhenkanal (R&B) Division

04

P/R TO GUDIAKATENI - HINDOL ROAD FORM 5/0 KM TO 7/700 KM.

3,028,227.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

05

P/R TO GUDIAKATENI - HINDOL ROAD FROM 0/0 KM TO 5/0 KM AND 8/800 KM TO 10/300 KM FOR 2015-2016

6,786,718.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

06

P/R TO DHENKANAL - KAMAKHYANAGAR ROAD FROM 1/700 KM TO 5/ 340 KM UP TO BRAMHANI BRIDGE EXCLUDING C.D. ROAD FOR THE YEAR 2015-2016

3,980,865.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

07

IMPROVEMENT TO KULAD GOTAMARA ROAD FOR 0/0 TO 1/0 AND 205 TO 4.0

23,717,000.00

Completed

Executive Engineer,
Angul (R&B) Division

08

BLACK TOPPING INCLUDING PROVISIONOF STREET LIGHTING OF THE DIVERSION ROAD FROM VILLAGE  NARAHARIPUR TO JILINDA ROAD JUNCTION OF BHUBANESWARI OCP, JAGANNATH AREA (ROAD ID NO. BBSRI OCP/RD/54)

5,650,899.85

Completed

Mahanadi Coalfields Ltd.

09

RESURFACING OF BITUMINOUS ROADS AND CONCRETING IN PATCHES AT DERA COLONY ROADS UNDER TALCHER COLLIERY

8,248,821.00

Completed

Mahanadi Coalfields Ltd.

10

IMPROVEMENT AND WIDENING OF INTERNAL ROAD OF IGIT,SARANGA OF DHENKANAL DISTRICT

20,862,146.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

11

PR FROM KM  75/200 TO 84/00 KM (EXCEPT KM. 77/650 TO 79/250 KM ON CHAINPAL ROB APPROACH) OF N.H. -149 FOR THE YEAR 2017-18

14,867,558.00

Completed

Executive Engineer
NH Division, Pallahara

12

PR FROM KM 314/130 TO 321/00 KM OF N.H.-53 FOR THE YEAR 2017-18

26,018,914.00

Completed

Executive Engineer
NH Division, Pallahara

13

IMPROVEMENT OT PALASPITHIA TO MATHAKARAGOLA VIA SURAPRATAPUR AND JAMUNAKOTA ROAD

41,214,704.00

Completed

Executive Engineer
Rural Works Division-II,Dkl
Kamakhyanagar

14

IMPROVEMENT TO KANKADAHAD TO MARDA ROAD UNDER STATE PLAN IMPROVEMENT TO EXISITING R.D. ROAD IN THE DISTRICT OF DHENKANAL

37,959,338.00

Completed

Executive engineer
Rural Works Division-II,Dkl
Kamakhyanagar

15

IMPROVEMENT AND WIDENING TO 4- LANING WITH MEDIAN AND PAVED SHOULDER FROM  PKDA CHHAK TO ACHARYA HARIHAR CHHAK VIA SCS COLLEGE, POST OFFICE AND KACHERI CHHAK FROM 0/0 TO 1/313 KM AND FROM 0/0 KM TO 0/226 KM UNDER ABADHA SCHEME

4,61,14,939.00

Completed

Executive Engineer,
Puri(R&B) Division

16

IMPROVEMENT TO BARKOTE -DARJING ROAD 0/00 K.M TO 17/900 K.M. WITH WIDENING OF C.D. WORK IN THE DISTRICT OF DEOGARH UNDER CRN FOR THE YEAR 2017-18

 

43,788,243.00

Completed

Executive Engineer,
Deogarh(R&B) Division

17

IMPROVEMENT TO UKLD ROAD FROM 0/0 KM TO 3/840 KM KAMAKHYANAGAR TAHASIL OFFICE FRONT TO  KANDARSINGA CHHAKA VIA MAHIMA TUNGI AND VILLAGE IINDIPUR FROM WARD NO 6.2 TO 1 FOR THE YEAR 2017-2018

29,818,992.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

18

IMPROVEMENT OF PWD ROAD FROM ATHANI HOUSE TO BINJHEI NALLAH VIA KAMANDALEI VILLAGE IN WARD NO-01 IN HINDOL ROWN ROAD FROM 0/0 KM 3/300 KM FOR THE YEAR 2017-2018

29,764,539.00

Completed

Executive Engineer
Dhenkanal
(R & B)Division

19

DEVELOPMENT OF ROAD CONNECTING SAINIK SCHOOL TO DAMANA CHHAK(2/500 to 3/490 Km), BHUBANESWAR.

38,535,375.59

Completed

Chief Engineer-cum-Engineer Member, BDA, Bhubaneswar

20

WIDENING AND STRENGTHENING OF ANGUL KALAMCHHUIN ROAD (ODR) FROM 0/0 KM TO 14/800 KM UNDER DISTRICT MINERAL FUND IN THE DISTRICT OF ANGUL.

219,560,746.00

Completed

G.V.V/Executive Engineer,
Angul(R&B) Division

21

CONSTRUCTION OF NEW COAL CORRIDOR PASSING THROUGH LINGARAJ OCP(PHASE-I) IN TALCHER COALFIELDS OF MCL

229,680,400.00

Completed

GVV/ General Manager (Civil/HOD)
MCL, Sambalpur

22

CONSTRUCTION OF INTERNAL MINE COAL TRANSPORTATION ROAD IN TALCHER COALFIELDS AT JAGANNATH OCP OF MCL

28,30,70,343.00

Completed

NICPL-SSIPL JV
General Manager (Civil/HOD)
MCL, Sambalpur

23

WIDENING AND STRENGTHENING OF BALIMI BABANDHA ODAPADA ROAD FROM 0/00 KM TO 18/923(EXCEPT FROM  13/470 TO 14/300KM) IN THE DISTRICT OF DHENKANAL UNDER STATE PLAN FOR THE YEAR 2018-19

15,34,37,759.00

Completed

Bhawani Construction/ Executive Engineer
Dhenkanal
(R & B)Division

24

IMPROVEMENT TO GOLASAR-BALIPATA ROAD (ODR) FROM 0/000KM TO 7/500KM IN THE DISTRICT OF ANGUL UNDER STATE PLAN

5,03,34,982.00

Completed

Executive Engineer,
Angul(R&B) Division

25

RECARPETING OF BITUMINUS ROADS OF NSCH PREMISES CH AREA TALCHER

96,61,285

Completed

General Manager (Civil/HOD)
MCL, Sambalpur

26

CONSTRUCTION OF SHOULDER ON BOTH SIDES OF ROAD ALONG NH-149 ON A LENGTH OF 2.5KM BETWEEN PABITRAMOHAN CHHAK TO BANKADHARA CHHAK, LINGARAJ AREA AS A CSR INITIATIVE OF MCL

1,38,59,687.00

Completed

General Manager (Civil/HOD)
MCL, Sambalpur

27

SUPPLY OF 52000CUM OF HARD STONE MACHINE CRUSHED BALLAST OF 50MM SIZE AT RAJAATHAGARH DEPOT & LOADING THE SAME IN TO ANY TYPE OF RAILWAY WAGON FOR KHURDA ROAD DIVISION

8,02,62,702.00

Completed

Jyotee Construction & Engg Pvt Ltd/ Divisional Engineer(Central) E.Co Rly, Khurda Road

28

SUPPLY OF 52000CUM OF HARD STONE MACHINE CRUSHED BALLAST OF 50MM SIZE AT HINDOLROAD DEPOT & LOADING THE SAME IN TO ANY TYPE OF RAILWAY WAGON FOR KHURDA ROAD DIVISION

7,66,98,440.00

Completed

Jyotee Construction & Engg Pvt Ltd/ Divisional Engineer(Central) E.Co Rly, Khurda Road

29

SUPPLY OF BALLAST IN CONNECTION WITH 3RD AND 4TH LINE WORKS BETWEEN HINDOLROAD AND BUDHAPANKA IN KHURDA DIVISION

18,79,52,363.00

Completed

Jyotee-SSIPL(JV) / Divisional Engineer(Central) E.Co Rly, Khurda Road

30

WIDENING OF EXISTING I/L TO TWO LANE WITH MEDIAN PROVISION FROM 27.290KM TO 29.600KM OF TALCHER GOPALPRASAD KANIHA ROAD UNDER DMF

3,61,96,594.00

Completed

Executive Engineer,
Angul(R&B) Division

31

CONSTRUNCTION OF 4.50MTR WIDE, 360 MTR LONG CC ROAD (PERIPHERY OF PLANT COMOUND) AT TARKABEDA VILLAGE AREA.

25,43,503.57

Completed

Rungta Mines Limited,.Dhenkanal

32

Construnction of 1200 Mtr. long RCC road  with RCC drainage on Periphry road (Part of RD road from Bistambandh to NH-55)

1,61,82,139.50

Completed

Rungta Mines Limited,.Dhenkanal

33

“CONSTRUCTION OF H.L. BRIDGE OVER RIVER MUSHAL AT 2.00 KM OF HARICHANDANPUR BAZAR PORTION ROAD (ODR) FOR THE YEAR 2019-20”

4,36,08,055.00

Ongoing

Executive Engineer,
Ghatagaon (R&B) Division

34

REPAIR & MAINTANCE OF RD ROAD 780 MTR LONG WITH RCC ROAD HAVING WIDE 7.50 MTR & 75 MTR LONG DRAIN HAVING SIZE 600 MM X 600 MM LONG AT ONE SIDE FOR PART OF RD ROAD FROM PLANT MAIN GATE TO PROPOSED STAFF COLONY PLOT SITE.

99,08,238.10

Completed

Rungta Mines Limited,.Dhenkanal

35

CONSTRUNCTION OF CIVIL WORKS FOR PROPSE TWO NO OF BRIDGES OVER RENGALI RIGHT CANAL (i) 300 MTR LONG STRUCTURAL BRIDGE 10 MTR WIDTHS. (II) 30MTR CONNECTING THE APPROACH ROAD FROM NH-55 TO BAILEY BRIDGE WITH 6MTR WIDTHS

94,40,000.00

Completed

Rungta Mines Limited,.Dhenkanal

36

CONSTRUCTION OF G+6 ACCOMODATION BLOCK UPTO PLINTH BEAM AT STAFF COLONY AREA AT DHENKANAL STEEL PLANT AREA

21,44,151.00

Completed

Rungta Mines Limited,.Dhenkanal

37

CONSTRUCTION OF DOUBLE STOREY CLUB HOUSE BUILDING OF 100000 SQFT AND SWIMMING POOL AT TAMANDA, DIST DHENKANAL OF SAI LAXMI NURSERY,

 

Completed

Sai Laxmi Nursery

38

CONSTRUCTION OF DOUBLE STOREY 16000SQFT ADMINISTRATIVE BUILDING OF TATA MOTORS AUTHORISED SERVICE STATION (HEAVY VEHILCES) , STAFF QUARTERS AND WORKSHOP SHEDS 6000SQFT AT DHALPUR, DHENKANAL

 

Completed

Sai Sambhu Automobiles Pvt Ltd

39

CONSTRUCTION OF G PLUS 4  APARTMENT BUILDING( STAFF QUARTERS)12500SQFT  AT DHALPUR DIST DHENKANAL FOR M/S VINAYAK FOODS AND FEEDS PVT LTD,

 

Ongoing

Vinayak Foods and Feeds Pvt Ltd,
Bhubaneswar

40

CONSTRUCTION OF 7 NOS G PLUS -3 , 2 BHK, BACHELOR'S QTR (71600SQFT)  AT 3.57 ACRES LAND IN FRONT OF MAIN GATE OF RUNGTA STEEL AND MINES LTD, DHENKANAL PLANT ,JHARBANDA ,ODISHA

 

Ongoing

Rungta Mines Limited,.Dhenkanal

41

IMPROVEMENT TO GHANTIKHALA – NUASASAN ROAD VIA GAJAMBA FROM 0/00 KM TO 7/400 KM

12,59,31,528.00

Ongoing

Executive Engineer, Road & Building Division,Charbatia

42

DEVLOPMENT OF ROAD FROM PASCHIMESWAR TAMPLE TO SANTHAPADA BRIDGE NEARBY BANK OF BRAHMANI RIVER.

4,20,11,691.00

Ongoing

Executive Engineer,
Road & Building Division,Angul

43

IMPROVEMENT TO ROAD & CD WORKS UNDER PMGSY FOR THE PACKAGE NO. OR-09-177/PMGSY-III(BATCH-I) 2020-21 IN THE DISTRICT OF DHENKANAL

5,88,32,280.00

Ongoing

Executive Engineer,
Rural Works Division, Dhenkanal

44

IMPROVEMENT TO ROAD & CD WORKS UNDER PMGSY FOR THE PACKAGE NO. OR-09-182/PMGSY-III(BATCH-I) 2020-21 IN THE DISTRICT OF DHENKANAL

7,38,40,296.00

Ongoing

Executive Engineer,
Rural Works Division, Dhenkanal

45

 CONSTRUNCTION OF H.L. BRIDGE OVER “RIVER FAPUDIA” AT CH 3.810 KM ON NH-215 (SALAPADA) TO PATHARAPADA VIA SAREI BHAGANAI & MADANPUR ROAD (ODR) UNDER GHATAGAON (R&B) DIVISION.

3,51,84,217.00

Ongoing

Executive Engineer (R&B) Division, Ghatagaon.

46

CONSTRUNCTION OF JANHA CHAKKA TO FIRE STATION CHAKKA (LEFT OUT PORTION OF OLD NH-215) ODDR SUCH AS WENDING & STRENGTHENING ROAD TO 4 LANE INCLUDING CONSTRUNCTION OF RCC DRAIN FROM 11/689 KM TO 14/110 KM UNDER DMF  FOR THE YEAR 2020-21

7,15,18,473.00

Ongoing

Executive Engineer (R&B) Division, Panikoili.

47

"CONSTRUCTION OF AN UNDERPASS AT BALUNGA CHOWK, LINGARAJ AREA.”,  VIDE E-TENDER NOTICE NO.MCL/GM(LA)/E-TENDER/SO            (C )/20-21/41 DTD 16.07.2020

2,12,49,011.00

Ongoing

General Manager, MCL- Lingaraj Area, Talcher, Angul

48

CONSTRUCTION OF CONCRETE PAVEMENT ON BARSUAN BIRSAM-UNDA CHHAK  TO BANKABAZAR     ROAD      FROM 1.000    KM   TO   3.700    KM UNDER  DMF FUND IN THE DISTRICT  OF  SUNDARGARH  FOR THE YEAR 2020-21

12,35,72,929.00

Ongoing

Executive Engineer,
Rourkela (R&B) Division

49

IMPROVEMENT OF ROAD FROM KODAGADIA TO MIRISINGHA ROAD UNDER CHAMPUA BLOCK UNDER DMF

3,45,25,065.00

Ongoing

Executive Engineer,
Champua  (RW) Division

50

EARTH WORK EXAVATTION & BACK FILLING AT 40TH BAR MILL (EQUIPMENT FOUNDATION WORK) AT DHENKANAL PROJECT SITE

1,12,32,305.00

Ongoing

Rungta Mines Limited,.Dhenkanal

51

CONSTRUNCTION OF TWO LANE APPROACH ROAD UPTO GSB, IN PHASE -1 HAVING LENGTH -2900 MTR AND 7.5 MTR WIDTH OF EACH LANE INCLUDING RCC BOX CULVERTS FROM NH-55 TO PLANT GATE AT DHENKNAL STEEL PLANT.

7,89,57,307.18

Ongoing.

Rungta Mines Limited, Dhenkanal.

52

EXAVATION OF SURROUNDING AREA I.E NORTH EAST SITE OF PROPED SWITCH YARD. PROJECT TO BE TAKEN UP IN THE PLANT PERMISES AT DHENKANAL STEEL PLANT

 1,03,95,502.60

Ongoing

Rungta Mines Limited,.Dhenkanal

53

CONSTRUNCTION OF 2185 MTR PRECST BOUNDARY WALL WITH 150MM THK RCC STRENGHTING WALL ADJACENT TO PRECAST WALL WITH 3 NOS. GATE AT 28 ACR. LAND STAFF COLONY AREA. I.E. OUTSIDE OF DHENKANAL STEEL PALNT.

1,40,61,351.27

Ongoing

Rungta Mines Limited,.Dhenkanal

54

EXECUTION OF BALANCE WORK (OVER WMM / SUB BASE ) OF INTERNAL ROAD TO BE TAKEN UP PROJECT AREA IN PHASE -1 INSIDE THE PLANT PERMISES AT DHENKANAL STEEL PLANT.

46,17,340.00

Ongoing

Rungta Mines Limited,.Dhenkanal

55

DEVELOPMENT OF BYPASS ROAD CONNECTING FROM DANLA GATE INSIDE OMC LEASE TO NH-49 NEAR SUAKATI OF GANDHAMARDHAN IRON ORE MINES FROM 0.0 TO 3.457KM IN THE DISTRICT OF KEONJHAR  FOR THE YEAR 2021-22 UNDER OMC FUNDING.

28,02,72,238.00

Ongoing

Executive Engineer,
Keonjhar (R&B) Division

56

“CONSTRUCTION OF H.L. BRIDGE OVER OVER SATAJURIA NALLAH AT CH.26/950KM ON KUARMUNDA-PURUNAPANI-NUAGAON ROAD (O.D.R) IN THE DISTRICT OF SUNDARGARH UNDER STATE PLAN FOR THE YEAR 2021-22”

3,29,43,624.00

Ongoing

Executive Engineer,
Rourkela  (R&B) Division

57

WORK ORDER FOR RAILWAY RAKE HANDLING & LOCAL TRANSPORTATION FROM HINDOL ROAD RAILWAR STATION SIDING TO RUNGTA PLANT SITE, JHARBANDHA, NIMABAHALI, DHENKANAL

 

Ongoing

Rungta Mines Limited,.Dhenkanal

58

CONSTRUCTION OF ALTERNATIVE CEMENT CONCRETE ROAD 1400MTR LONG HAVING WIDTH 4.5MTR FROM TARKABEDA CHHAK TO TOWARDS PLAND BOUNDARY WALL UNDER CSR INITIATIVE FOR FY 2021-22 VIDE HO APPROVAL NO-CBSA/CIVIL/21-22/273 DT: 16-12-2021

76,03,471.00

Ongoing

 

About usSai sambhu infrastructure private limited

The company was started five years back by “Rout Brothers” and after being held as a small entity, It evolved to its presents form as “Sai Sambhu Infrastructure PrivateLimited”

Read more

Photo gallerySome Featured Photos

Contact infoOur Location and Phone Numbers

 Corp Office : Plot no - 684 & 686 Villa Square, Infront of Navjeevan Church Near Ekamrakanan, Jaydev Vihar, Bhubaneswar-751015

  saisambhuinfra.in

This email address is being protected from spambots. You need JavaScript enabled to view it.                                            

    +91-9337635187