Recent Major Completed and Ongoing Projects :
S. No |
DESCRIPTION OF WORK |
VALUE OF WORK ORDER |
STATUS |
NAME OF THE CLIENT |
|
01 |
IMPROVEMENT FROM COLLEGE JUNCTION TO MISHRAPADA JUNCTION OF ANGUL TOWN ROAD |
7,501,036.00 |
Completed |
Executive Engineer, |
|
02 |
S/R TO BALIMI--BABANDHA-PDA ADA ROAD |
20,491,177.00 |
Completed |
Executive Engineer |
|
03 |
IMPROVEMENT TO OLD N.H -42 ROAD FROM 79/745 KM TO 82/750 KM AND 84/0 KM TO 84/400 KM NEAR MERAMUNDALI IN THE DISTRICT OF DHENKANAL UNDER STATE PLAN FOR THE YEAR 2016-2017 |
21,404,564.00 |
Completed |
Executive Engineer |
|
04 |
P/R TO GUDIAKATENI - HINDOL ROAD FORM 5/0 KM TO 7/700 KM. |
3,028,227.00 |
Completed |
Executive Engineer |
|
05 |
P/R TO GUDIAKATENI - HINDOL ROAD FROM 0/0 KM TO 5/0 KM AND 8/800 KM TO 10/300 KM FOR 2015-2016 |
6,786,718.00 |
Completed |
Executive Engineer |
|
06 |
P/R TO DHENKANAL - KAMAKHYANAGAR ROAD FROM 1/700 KM TO 5/ 340 KM UP TO BRAMHANI BRIDGE EXCLUDING C.D. ROAD FOR THE YEAR 2015-2016 |
3,980,865.00 |
Completed |
Executive Engineer |
|
07 |
IMPROVEMENT TO KULAD GOTAMARA ROAD FOR 0/0 TO 1/0 AND 205 TO 4.0 |
23,717,000.00 |
Completed |
Executive Engineer, |
|
08 |
BLACK TOPPING INCLUDING PROVISIONOF STREET LIGHTING OF THE DIVERSION ROAD FROM VILLAGE NARAHARIPUR TO JILINDA ROAD JUNCTION OF BHUBANESWARI OCP, JAGANNATH AREA (ROAD ID NO. BBSRI OCP/RD/54) |
5,650,899.85 |
Completed |
Mahanadi Coalfields Ltd. |
|
09 |
RESURFACING OF BITUMINOUS ROADS AND CONCRETING IN PATCHES AT DERA COLONY ROADS UNDER TALCHER COLLIERY |
8,248,821.00 |
Completed |
Mahanadi Coalfields Ltd. |
|
10 |
IMPROVEMENT AND WIDENING OF INTERNAL ROAD OF IGIT,SARANGA OF DHENKANAL DISTRICT |
20,862,146.00 |
Completed |
Executive Engineer |
|
11 |
PR FROM KM 75/200 TO 84/00 KM (EXCEPT KM. 77/650 TO 79/250 KM ON CHAINPAL ROB APPROACH) OF N.H. -149 FOR THE YEAR 2017-18 |
14,867,558.00 |
Completed |
Executive Engineer |
|
12 |
PR FROM KM 314/130 TO 321/00 KM OF N.H.-53 FOR THE YEAR 2017-18 |
26,018,914.00 |
Completed |
Executive Engineer |
|
13 |
IMPROVEMENT OT PALASPITHIA TO MATHAKARAGOLA VIA SURAPRATAPUR AND JAMUNAKOTA ROAD |
41,214,704.00 |
Completed |
Executive Engineer |
|
14 |
IMPROVEMENT TO KANKADAHAD TO MARDA ROAD UNDER STATE PLAN IMPROVEMENT TO EXISITING R.D. ROAD IN THE DISTRICT OF DHENKANAL |
37,959,338.00 |
Completed |
Executive engineer |
|
15 |
IMPROVEMENT AND WIDENING TO 4- LANING WITH MEDIAN AND PAVED SHOULDER FROM PKDA CHHAK TO ACHARYA HARIHAR CHHAK VIA SCS COLLEGE, POST OFFICE AND KACHERI CHHAK FROM 0/0 TO 1/313 KM AND FROM 0/0 KM TO 0/226 KM UNDER ABADHA SCHEME |
4,61,14,939.00 |
Completed |
Executive Engineer, |
|
16 |
IMPROVEMENT TO BARKOTE -DARJING ROAD 0/00 K.M TO 17/900 K.M. WITH WIDENING OF C.D. WORK IN THE DISTRICT OF DEOGARH UNDER CRN FOR THE YEAR 2017-18
|
43,788,243.00 |
Completed |
Executive Engineer, |
|
17 |
IMPROVEMENT TO UKLD ROAD FROM 0/0 KM TO 3/840 KM KAMAKHYANAGAR TAHASIL OFFICE FRONT TO KANDARSINGA CHHAKA VIA MAHIMA TUNGI AND VILLAGE IINDIPUR FROM WARD NO 6.2 TO 1 FOR THE YEAR 2017-2018 |
29,818,992.00 |
Completed |
Executive Engineer |
|
18 |
IMPROVEMENT OF PWD ROAD FROM ATHANI HOUSE TO BINJHEI NALLAH VIA KAMANDALEI VILLAGE IN WARD NO-01 IN HINDOL ROWN ROAD FROM 0/0 KM 3/300 KM FOR THE YEAR 2017-2018 |
29,764,539.00 |
Completed |
Executive Engineer |
|
19 |
DEVELOPMENT OF ROAD CONNECTING SAINIK SCHOOL TO DAMANA CHHAK(2/500 to 3/490 Km), BHUBANESWAR. |
38,535,375.59 |
Completed |
Chief Engineer-cum-Engineer Member, BDA, Bhubaneswar |
|
20 |
WIDENING AND STRENGTHENING OF ANGUL KALAMCHHUIN ROAD (ODR) FROM 0/0 KM TO 14/800 KM UNDER DISTRICT MINERAL FUND IN THE DISTRICT OF ANGUL. |
219,560,746.00 |
Completed |
G.V.V/Executive Engineer, |
|
21 |
CONSTRUCTION OF NEW COAL CORRIDOR PASSING THROUGH LINGARAJ OCP(PHASE-I) IN TALCHER COALFIELDS OF MCL |
229,680,400.00 |
Completed |
GVV/ General Manager (Civil/HOD) |
|
22 |
CONSTRUCTION OF INTERNAL MINE COAL TRANSPORTATION ROAD IN TALCHER COALFIELDS AT JAGANNATH OCP OF MCL |
28,30,70,343.00 |
Completed |
NICPL-SSIPL JV |
|
23 |
WIDENING AND STRENGTHENING OF BALIMI BABANDHA ODAPADA ROAD FROM 0/00 KM TO 18/923(EXCEPT FROM 13/470 TO 14/300KM) IN THE DISTRICT OF DHENKANAL UNDER STATE PLAN FOR THE YEAR 2018-19 |
15,34,37,759.00 |
Completed |
Bhawani Construction/ Executive Engineer |
|
24 |
IMPROVEMENT TO GOLASAR-BALIPATA ROAD (ODR) FROM 0/000KM TO 7/500KM IN THE DISTRICT OF ANGUL UNDER STATE PLAN |
5,03,34,982.00 |
Completed |
Executive Engineer, |
|
25 |
RECARPETING OF BITUMINUS ROADS OF NSCH PREMISES CH AREA TALCHER |
96,61,285 |
Completed |
General Manager (Civil/HOD) |
|
26 |
CONSTRUCTION OF SHOULDER ON BOTH SIDES OF ROAD ALONG NH-149 ON A LENGTH OF 2.5KM BETWEEN PABITRAMOHAN CHHAK TO BANKADHARA CHHAK, LINGARAJ AREA AS A CSR INITIATIVE OF MCL |
1,38,59,687.00 |
Completed |
General Manager (Civil/HOD) |
|
27 |
SUPPLY OF 52000CUM OF HARD STONE MACHINE CRUSHED BALLAST OF 50MM SIZE AT RAJAATHAGARH DEPOT & LOADING THE SAME IN TO ANY TYPE OF RAILWAY WAGON FOR KHURDA ROAD DIVISION |
8,02,62,702.00 |
Completed |
Jyotee Construction & Engg Pvt Ltd/ Divisional Engineer(Central) E.Co Rly, Khurda Road |
|
28 |
SUPPLY OF 52000CUM OF HARD STONE MACHINE CRUSHED BALLAST OF 50MM SIZE AT HINDOLROAD DEPOT & LOADING THE SAME IN TO ANY TYPE OF RAILWAY WAGON FOR KHURDA ROAD DIVISION |
7,66,98,440.00 |
Completed |
Jyotee Construction & Engg Pvt Ltd/ Divisional Engineer(Central) E.Co Rly, Khurda Road |
|
29 |
SUPPLY OF BALLAST IN CONNECTION WITH 3RD AND 4TH LINE WORKS BETWEEN HINDOLROAD AND BUDHAPANKA IN KHURDA DIVISION |
18,79,52,363.00 |
Completed |
Jyotee-SSIPL(JV) / Divisional Engineer(Central) E.Co Rly, Khurda Road |
|
30 |
WIDENING OF EXISTING I/L TO TWO LANE WITH MEDIAN PROVISION FROM 27.290KM TO 29.600KM OF TALCHER GOPALPRASAD KANIHA ROAD UNDER DMF |
3,61,96,594.00 |
Completed |
Executive Engineer, |
|
31 |
CONSTRUNCTION OF 4.50MTR WIDE, 360 MTR LONG CC ROAD (PERIPHERY OF PLANT COMOUND) AT TARKABEDA VILLAGE AREA. |
25,43,503.57 |
Completed |
Rungta Mines Limited,.Dhenkanal |
|
32 |
Construnction of 1200 Mtr. long RCC road with RCC drainage on Periphry road (Part of RD road from Bistambandh to NH-55) |
1,61,82,139.50 |
Completed |
Rungta Mines Limited,.Dhenkanal |
|
33 |
“CONSTRUCTION OF H.L. BRIDGE OVER RIVER MUSHAL AT 2.00 KM OF HARICHANDANPUR BAZAR PORTION ROAD (ODR) FOR THE YEAR 2019-20” |
4,36,08,055.00 |
Ongoing |
Executive Engineer, |
|
34 |
REPAIR & MAINTANCE OF RD ROAD 780 MTR LONG WITH RCC ROAD HAVING WIDE 7.50 MTR & 75 MTR LONG DRAIN HAVING SIZE 600 MM X 600 MM LONG AT ONE SIDE FOR PART OF RD ROAD FROM PLANT MAIN GATE TO PROPOSED STAFF COLONY PLOT SITE. |
99,08,238.10 |
Completed |
Rungta Mines Limited,.Dhenkanal |
|
35 |
CONSTRUNCTION OF CIVIL WORKS FOR PROPSE TWO NO OF BRIDGES OVER RENGALI RIGHT CANAL (i) 300 MTR LONG STRUCTURAL BRIDGE 10 MTR WIDTHS. (II) 30MTR CONNECTING THE APPROACH ROAD FROM NH-55 TO BAILEY BRIDGE WITH 6MTR WIDTHS |
94,40,000.00 |
Completed |
Rungta Mines Limited,.Dhenkanal |
|
36 |
CONSTRUCTION OF G+6 ACCOMODATION BLOCK UPTO PLINTH BEAM AT STAFF COLONY AREA AT DHENKANAL STEEL PLANT AREA |
21,44,151.00 |
Completed |
Rungta Mines Limited,.Dhenkanal |
|
37 |
CONSTRUCTION OF DOUBLE STOREY CLUB HOUSE BUILDING OF 100000 SQFT AND SWIMMING POOL AT TAMANDA, DIST DHENKANAL OF SAI LAXMI NURSERY, |
|
Completed |
Sai Laxmi Nursery |
|
38 |
CONSTRUCTION OF DOUBLE STOREY 16000SQFT ADMINISTRATIVE BUILDING OF TATA MOTORS AUTHORISED SERVICE STATION (HEAVY VEHILCES) , STAFF QUARTERS AND WORKSHOP SHEDS 6000SQFT AT DHALPUR, DHENKANAL |
|
Completed |
Sai Sambhu Automobiles Pvt Ltd |
|
39 |
CONSTRUCTION OF G PLUS 4 APARTMENT BUILDING( STAFF QUARTERS)12500SQFT AT DHALPUR DIST DHENKANAL FOR M/S VINAYAK FOODS AND FEEDS PVT LTD, |
|
Ongoing |
Vinayak Foods and Feeds Pvt Ltd, |
|
40 |
CONSTRUCTION OF 7 NOS G PLUS -3 , 2 BHK, BACHELOR'S QTR (71600SQFT) AT 3.57 ACRES LAND IN FRONT OF MAIN GATE OF RUNGTA STEEL AND MINES LTD, DHENKANAL PLANT ,JHARBANDA ,ODISHA |
|
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
41 |
IMPROVEMENT TO GHANTIKHALA – NUASASAN ROAD VIA GAJAMBA FROM 0/00 KM TO 7/400 KM |
12,59,31,528.00 |
Ongoing |
Executive Engineer, Road & Building Division,Charbatia |
|
42 |
DEVLOPMENT OF ROAD FROM PASCHIMESWAR TAMPLE TO SANTHAPADA BRIDGE NEARBY BANK OF BRAHMANI RIVER. |
4,20,11,691.00 |
Ongoing |
Executive Engineer, |
|
43 |
IMPROVEMENT TO ROAD & CD WORKS UNDER PMGSY FOR THE PACKAGE NO. OR-09-177/PMGSY-III(BATCH-I) 2020-21 IN THE DISTRICT OF DHENKANAL |
5,88,32,280.00 |
Ongoing |
Executive Engineer, |
|
44 |
IMPROVEMENT TO ROAD & CD WORKS UNDER PMGSY FOR THE PACKAGE NO. OR-09-182/PMGSY-III(BATCH-I) 2020-21 IN THE DISTRICT OF DHENKANAL |
7,38,40,296.00 |
Ongoing |
Executive Engineer, |
|
45 |
CONSTRUNCTION OF H.L. BRIDGE OVER “RIVER FAPUDIA” AT CH 3.810 KM ON NH-215 (SALAPADA) TO PATHARAPADA VIA SAREI BHAGANAI & MADANPUR ROAD (ODR) UNDER GHATAGAON (R&B) DIVISION. |
3,51,84,217.00 |
Ongoing |
Executive Engineer (R&B) Division, Ghatagaon. |
|
46 |
CONSTRUNCTION OF JANHA CHAKKA TO FIRE STATION CHAKKA (LEFT OUT PORTION OF OLD NH-215) ODDR SUCH AS WENDING & STRENGTHENING ROAD TO 4 LANE INCLUDING CONSTRUNCTION OF RCC DRAIN FROM 11/689 KM TO 14/110 KM UNDER DMF FOR THE YEAR 2020-21 |
7,15,18,473.00 |
Ongoing |
Executive Engineer (R&B) Division, Panikoili. |
|
47 |
"CONSTRUCTION OF AN UNDERPASS AT BALUNGA CHOWK, LINGARAJ AREA.”, VIDE E-TENDER NOTICE NO.MCL/GM(LA)/E-TENDER/SO (C )/20-21/41 DTD 16.07.2020 |
2,12,49,011.00 |
Ongoing |
General Manager, MCL- Lingaraj Area, Talcher, Angul |
|
48 |
CONSTRUCTION OF CONCRETE PAVEMENT ON BARSUAN BIRSAM-UNDA CHHAK TO BANKABAZAR ROAD FROM 1.000 KM TO 3.700 KM UNDER DMF FUND IN THE DISTRICT OF SUNDARGARH FOR THE YEAR 2020-21 |
12,35,72,929.00 |
Ongoing |
Executive Engineer, |
|
49 |
IMPROVEMENT OF ROAD FROM KODAGADIA TO MIRISINGHA ROAD UNDER CHAMPUA BLOCK UNDER DMF |
3,45,25,065.00 |
Ongoing |
Executive Engineer, |
|
50 |
EARTH WORK EXAVATTION & BACK FILLING AT 40TH BAR MILL (EQUIPMENT FOUNDATION WORK) AT DHENKANAL PROJECT SITE |
1,12,32,305.00 |
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
51 |
CONSTRUNCTION OF TWO LANE APPROACH ROAD UPTO GSB, IN PHASE -1 HAVING LENGTH -2900 MTR AND 7.5 MTR WIDTH OF EACH LANE INCLUDING RCC BOX CULVERTS FROM NH-55 TO PLANT GATE AT DHENKNAL STEEL PLANT. |
7,89,57,307.18 |
Ongoing. |
Rungta Mines Limited, Dhenkanal. |
|
52 |
EXAVATION OF SURROUNDING AREA I.E NORTH EAST SITE OF PROPED SWITCH YARD. PROJECT TO BE TAKEN UP IN THE PLANT PERMISES AT DHENKANAL STEEL PLANT |
1,03,95,502.60 |
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
53 |
CONSTRUNCTION OF 2185 MTR PRECST BOUNDARY WALL WITH 150MM THK RCC STRENGHTING WALL ADJACENT TO PRECAST WALL WITH 3 NOS. GATE AT 28 ACR. LAND STAFF COLONY AREA. I.E. OUTSIDE OF DHENKANAL STEEL PALNT. |
1,40,61,351.27 |
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
54 |
EXECUTION OF BALANCE WORK (OVER WMM / SUB BASE ) OF INTERNAL ROAD TO BE TAKEN UP PROJECT AREA IN PHASE -1 INSIDE THE PLANT PERMISES AT DHENKANAL STEEL PLANT. |
46,17,340.00 |
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
55 |
DEVELOPMENT OF BYPASS ROAD CONNECTING FROM DANLA GATE INSIDE OMC LEASE TO NH-49 NEAR SUAKATI OF GANDHAMARDHAN IRON ORE MINES FROM 0.0 TO 3.457KM IN THE DISTRICT OF KEONJHAR FOR THE YEAR 2021-22 UNDER OMC FUNDING. |
28,02,72,238.00 |
Ongoing |
Executive Engineer, |
|
56 |
“CONSTRUCTION OF H.L. BRIDGE OVER OVER SATAJURIA NALLAH AT CH.26/950KM ON KUARMUNDA-PURUNAPANI-NUAGAON ROAD (O.D.R) IN THE DISTRICT OF SUNDARGARH UNDER STATE PLAN FOR THE YEAR 2021-22” |
3,29,43,624.00 |
Ongoing |
Executive Engineer, |
|
57 |
WORK ORDER FOR RAILWAY RAKE HANDLING & LOCAL TRANSPORTATION FROM HINDOL ROAD RAILWAR STATION SIDING TO RUNGTA PLANT SITE, JHARBANDHA, NIMABAHALI, DHENKANAL |
|
Ongoing |
Rungta Mines Limited,.Dhenkanal |
|
58 |
CONSTRUCTION OF ALTERNATIVE CEMENT CONCRETE ROAD 1400MTR LONG HAVING WIDTH 4.5MTR FROM TARKABEDA CHHAK TO TOWARDS PLAND BOUNDARY WALL UNDER CSR INITIATIVE FOR FY 2021-22 VIDE HO APPROVAL NO-CBSA/CIVIL/21-22/273 DT: 16-12-2021 |
76,03,471.00 |
Ongoing |
|